Welcome to E-Goat :: The Totally Unofficial Royal Air Force Rumour Network
Join our free community to unlock a range of benefits like:
  • Post and participate in discussions.
  • Send and receive private messages with other members.
  • Respond to polls and surveys.
  • Upload and share content.
  • Gain access to exclusive features and tools.
Join 7.5K others today

ALL TG1 PVR times 12 Months from December

  • Following weeks of work, the E-GOAT team are delighted to present to you a new look to the forums with plenty of new features. Take a look around and see what you think!
That was a bit sneaky, updating the spreadsheet to increase the PVR times to 12 months without advertising it.

Aligned with the SDSR announcements and the removal of beers on JPA.

Boom - I'm out of here!
 
Between project Zeus/Apollo, FF2020, AFPS15, NEM and years of 1% pay rises they have right royally f**ked up what was once a great career for people. Are they so blind to realise that ex forces personnel are highly employable and there's a lot of work out there, especially for TG1? I was genuinely shocked by the opportunities I've been offered this week without really trying.
 
Seems very coincidental how they have shuffled the PVR time up about 2 months before the pay supplements are released... Might it be that TG1 won't get their own pay supplement and instead be mixed in with the proles?
 
In my view, and according the brief this year, It's just a numbers game. Retention has been tracking below the line for a while and this was allowed to happen as we have a SDSR target to hit for manpower. Now we are at the end of 2015, they are simply taking measures to coincide the required and actual numbers.

No great humanistic measures admittedly, but measures
 
Back
Top